It’s the first full room to be sheetrocked. We had to wait till the exterior wall next to the tub was insulated before installing the last pieces of sheetrock. Now we can start some of the more detailed work, like getting the marble slab for the tub surround measured and fitted, and preparing the shower and floor for tile.

Today is forecasted to be the first clear day in a week. So we’re finishing off the roof over the porch. Then hopefully we can finally finish off the siding on the south and west sides.