I wasn’t expecting a lot to get done last week with all the rain. But Warren had some help and a few sunny days to frame the inside wall in the basement, the temporary stairs up to the first floor and attach the sheathing for the first floor. We didn’t attack the second floor because we expected rain on Sunday. So we worked out details for the interior beveled wall at the windows, the sun shades on the first floor and the stairs. I’m hoping to model them up and post them in the coming weeks. Until then, enjoy the latest pics.