Having a few rain free days in a row can really make a difference. This week our excavator dug the trench to the well. He had to pound through a few areas of ledge. The well guys then installed the water pipe and electric line to power the pump. They will install the pump and tank a little later when we’re  farther along with the electric and plumbing.

This weekend we’re finishing up some of the window insulation details and framing out the bathroom wall for the pocket door.