Lot’s going on this month. If you follow us on twitter @uphillhouse you’ll know that we now have running water! Gould & Sons came out to install the pump and water pressure tank. They drilled the well a little over a year ago in June. See the post, Drill baby, drill!. They set the pump at 300’ which should give us 12-15 gallons per minute.
Last week also saw the installation of sheetrock on the 2nd floor and basement. Taping should be completed by the end of the week in those two areas so we can start priming and painting. As soon as we get the basement primed, we can move all the tools from the first floor to the basement. Then we can finish insulating and sheetrocking the first floor.
This weekend I was able to install the shower pan mortar base and drain. We’ll be using Kerdi-Drain and Kerdi membrane, a waterproofing material from Schluter, to water seal the shower enclosure. I’m hoping to get started with the membrane this week.
We also received several deliveries last week. Our water heater arrived. It’s a 50 gallon Marathon. It’s a very efficient electric water heater and well insulated. We decided not to go with the Hybrid heat pump approach, which is a great idea but not for our cold climate and dry basement. We decided against tankless hot water approaches because we’re all electric. I haven’t done a huge amount of research but it looks like the electric tankless approach is getting better over time. This may be a good approach in the future.
And our gutters finally arrived. Warren started putting up the front side gutters today. I’m working on a post about how we’re connecting the downspouts to the rain filter and cistern under the porch. It has taken quite a bit of research to figure it all out.
Tomorrow the tub surround will be installed. And hopefully the rain will hold off long enough tomorrow to finish installing the gutters and downspouts.
We’re trying to finish as much as we can for the Green Building Open House / National Solar Tour this Saturday. Many thanks to Paul and Joanne Coons from Clifton Parks for stopping by last weekend and dropping off the open house sign. You can find their house and lots of other amazing houses on the tour at the NESEA Green Buildings or the National Solar Tour sites. Stop by to visit.
Categories
- Air sealing 13
- Appliances & Fixtures 4
- Art 3
- Award 4
- Bathroom 8
- Batteries 1
- Decor 5
- Design 10
- Electrical 5
- Energy Calculations 13
- Energy Monitors 4
- Farm 1
- Finance 1
- Flooring 3
- Foundation 9
- Framing 8
- Heating 9
- House 7
- Insulation 8
- Kitchen 6
- Landscaping 3
- Lessons Learned 1
- Performance 60
- Plumbing 10
- Porch 5
- Radon 1
- Rainwater catchment 3
- Research / study 1
- Roof 7
- Septic / Waste water 2
- Sheetrock 6
- Siding 9
- Site Work 22
- Smart home 1
- Solar 64
- Solar Obsessed 10
- Stairs 2
- Surveying 3
- Ventilation 8
- Weather 1
- Windows & Doors 14
- plug-in 3
Archive
- Jan 2021 1
- Dec 2020 2
- May 2020 1
- Jan 2020 1
- May 2019 1
- Jan 2019 3
- Sep 2018 2
- Aug 2018 2
- Jan 2018 1
- Oct 2017 2
- Apr 2017 1
- Jan 2017 1
- Oct 2016 2
- Aug 2016 1
- Apr 2016 2
- Jan 2016 2
- Nov 2015 2
- Oct 2015 1
- Jul 2015 1
- May 2015 1
- Apr 2015 1
- Jan 2015 1
- Dec 2014 1
- Nov 2014 2
- Oct 2014 4
- Sep 2014 2
- Aug 2014 1
- Jul 2014 1
- Mar 2014 3
- Feb 2014 2
- Jan 2014 2
- Nov 2013 1
- Oct 2013 1
- Sep 2013 1
- Jul 2013 3
- Apr 2013 3
- Jan 2013 3
- Dec 2012 2
- Nov 2012 3
- Oct 2012 1
- Sep 2012 3
- Aug 2012 3
- Jul 2012 2
- Jun 2012 1
- May 2012 3
- Apr 2012 2
- Mar 2012 4
- Feb 2012 4
- Jan 2012 5
- Dec 2011 4
- Nov 2011 9
- Oct 2011 10
- Sep 2011 9
- Aug 2011 6
- Jul 2011 6
- Jun 2011 12
- May 2011 8
- Apr 2011 4
- Mar 2011 5
- Jan 2011 6
- Dec 2010 9
- Nov 2010 3
- Oct 2010 4
- Sep 2010 6
- Aug 2010 8
- Jul 2010 6
- Jun 2010 3
- May 2010 3
- Apr 2010 1
- Mar 2010 3
- Feb 2010 3
- Dec 2009 1
- Jun 2009 1
- May 2009 1
- Feb 2009 1
- Dec 2008 1
- Nov 2008 1
- Jun 2008 1