Yesterday our insulator, Don Patten and family, came over to finish insulating the house. They stapled up netting and did the first rough blow in roughly 6 hours. They are back today to do the second dense pack blow and top up the attic insulation in areas that settled. This will be the last of the cellulose insulation work. The remaining north and south rim joist areas between the first and second floors will be foamed later this week before the final sheet rocking begins.

In other news, Joe Bates, our friendly local excavator will be installing our septic tank and leach field today.